冷再生機的使用要有充分的施工準備
來源:http://dzjshs.cn/ 日期:2022-08-10 發(fā)布人:
施工現場管理貫穿于工程施工的全過程,充分的施工準備是管理好施工現場的基礎。施工單位只有通過充分的施工準備,才能保障冷再生機施工過程的連續(xù)、協(xié)調、均衡和經濟。冷再生機出租人員講解在進行冷再生機施工準備工作中應注意以下問題:
Construction site management runs through the whole process of project construction, and adequate construction preparation is the basis for managing the construction site. Only through adequate construction preparation can the construction unit ensure the continuity, coordination, balance and economy of the construction process of the cold regenerator. The following issues shall be paid attention to during the construction preparation of the cold regenerator:
1.要建立嚴謹、規(guī)范的內部約束、考核、激勵機制,用制度管人,用規(guī)章管理工程。
1. It is necessary to establish a rigorous and standardized internal restraint, assessment and incentive mechanism, manage people with systems and manage the project with regulations.
2.要補充調查工程沿線影響施工的因素,標注出平面位置圖,并進行、論證,寫出調查報告,作為修訂施工方案、編制施工控制預算的依據。
2. The factors affecting the construction along the project shall be supplemented and investigated, the plane location map shall be marked, and the investigation report shall be made and demonstrated as the basis for revising the construction scheme and preparing the construction control budget.
3.施工圖紙,吃透設計意圖,澄清圖紙中的問題,恢復定線和施工放樣。對所有控制點進行加密、保護、記錄。
3. Construction drawings, understand the design intent, clarify the problems in the drawings, and restore the alignment and construction setting out. Encrypt, protect and record all control points.
4.根據施工合同協(xié)議和現場調研認真編制施工控制預算,作為控制支出、進行成本預測分析、經濟核算以及統(tǒng)計工程進度的依據。
4. The construction control budget shall be carefully prepared according to the construction contract agreement and site investigation, as the basis for controlling expenditure, cost prediction and analysis, economic accounting and statistics of project progress.


5.進行業(yè)務、技術培訓和技術交底,使相關人員對工程的技術標準、操作規(guī)程、質量控制、資料整理有的了解。
5. Conduct business, technical training and technical disclosure to make relevant personnel have a comprehensive understanding of the technical standards, operating procedures, quality control and data sorting of the project.
6.建立工地試驗室,并申請臨時資質。對施工中擬使用的各種原材料取樣試驗,建立相關技術參數的數據庫。
6. Establish a site laboratory and apply for temporary qualification. Sample and test various raw materials to be used in the construction, and establish a database of relevant technical parameters.
7.繪制關鍵工序施工工藝流程圖和試驗操作規(guī)程、質量檢查評定、計量支付、設計變更、事故處理等操作管理框圖,并使圖表上墻。
7. Draw the key process construction process flow chart, test operation procedures, quality inspection and evaluation, measurement and payment, design change, accident treatment and other operation management block diagrams, and put the charts on the wall.
8.根據工期要求、技術標準、機械設備能力、材料供應、自然條件等進行綜合分析,選擇好的合適的施工方案,完善施工組織設計。
8. Conduct comprehensive analysis according to the construction period requirements, technical standards, mechanical equipment capacity, material supply, natural conditions, etc., select a proper construction scheme and improve the construction organization design.
在施工過程中,要保持冷再生機機械組合的相對穩(wěn)定。由于受進度、天氣等方面的影響,機械使用數量發(fā)生變化時,現場管理者須適時改變機械組合。更多注意事項就來我們網站http://dzjshs.cn看看吧。
During the construction, the mechanical combination of the cold regenerator shall be kept relatively stable. Due to the influence of progress, weather and other aspects, when the number of machinery used changes, the site manager must change the machinery combination in time. For more information, please visit our website http://dzjshs.cn Let's see.
下一篇:雙鋼輪壓路機的一些操作技巧 上一篇:選購冷再生機根據多方面優(yōu)勢來辨別
閱讀/ Recommended reading
- 冷再生機租賃國道改建顯“神功” 2025-10-30
- 冷再生機租賃助四川平昌加快公路提檔升級改造 2025-10-29
- 冷再生機租賃助力公路養(yǎng)護中心進行公路工程建設 2025-10-28
- 冷再生機憑借其節(jié)約能源養(yǎng)護時間短助力公路部門快速建設 2025-10-27
冷再生機租賃在濟青線修復養(yǎng)護工程開始動工建設
[2025-10-31]
S102濟青線諸城曹家泊高密柴溝段、高密柴溝高密膠州界段修復養(yǎng)護工程施工項目冷再生試驗段建設在柴溝鎮(zhèn)區(qū)東、西兩個標段同步展開。濰坊市公路事業(yè)發(fā)展中心、濰坊交通發(fā)展集團、高...